Work team Friday

Friday 7/24/26
Today, we finished welding all but (2) of the beds. Due to our Gather team needing the pavilion, we moved shop so that they can get set up. Tomorrow, we should be able to start painting the bed frames and start on the trash can receptacle holders. Other members of the team along with staff were able to wrap up the window trim and door trim to all of the cabins. As far as the beach Huts, the guys poured the concrete floor for the last one, and are working on the roof for the 3rd hut. We had a great night of worship with the Gather team to close out the day.